On April 27, 2021, ARE was awarded the first-ever BVLOS (Beyond Visual Line of Sight) waiver for utility line inspections in mountainous terrain.
In a collaborated effort, ARE and Eversource Energy are working toward the goal of utilizing BVLOS operations throughout the Eversource Transmission network. This waiver is a major steppingstone in proving out the safety case, technology and ConOps (Concept of Operations) for the end objective.